Major Work

Description

Activity

Unit

Q,ty

Comp. Date

Remarks

 Civil

 Concrete

M3

     11,685

01-10-31

 Paving

 Architecture

 COntrol Bldg. & Substation

M3

         473

01-03-31

 

 Steel Structure

 IBL

Ton

      1,552

01-05-31

 

 Equipment

 IBL

Set

         248

01-06-30

 Total 1,938 Ton

 OBL

Set

         278

01-06-30

 Total 1,029 Ton

 Tank

 CRT (3 Sets)

Ton

         337

01-05-31

 

 FRT (3 Sets)

Ton

         790

01-05-31

 

 Sph. Tank (2 Sets)

Ton

         560

01-08-31

 

 Pping

 18" Piping

D/I

     15,792

01-05-31

 

 Under Ground

D/I

     21,500

01-04-30

 

 IBL (UOP)

D/I

   116,236

01-10-31

 

 OBL (Non-UOP, OS & UT)

D/I

     75,827

01-10-31

 

 Electric

 U/G Cable & Ground Wire

M

     16,126

01-10-31

 

 A/G Cable

M

   137,420

01-10-31

 

 Instrument

 Inst. Cable

M

     82,100

01-12-31

 

 Insulation

 Insulation

M2

     10,888

01-12-31

 

 Painting

 Piping, Tank, Equip. & Stl./Str

M2

     73,368

01-11-30