Sub-Contract Status

No.

¾ü

ݾ

ݾ

   

1

 Site Grading Work

AFCO

    

    

     

 

2

 PHT, PWHT & Hardness Test

()̱

    

    

     

 

3

 Non Destructive Test

Ѱ˻()

    

    

     

 

4

 18" Pipeline & U/G Piping Work

()

  

    

     

 

5

 Field Erection Tank

()޸̳

  

  

    

 

6

 Pipe Rack & Tank Foundation Work

AFCO

    

  

    

 

7

 Stl./Str., Equip. Piping (IBL)

()

  

  

    

 

8

 Stl./Str., Equip. (OBL)

()޸̳

    

  

    

 

9

 Piping (OBL)

()

  

  

    

 

10

 Control Bldg. & Substation

Naruny

    

  

    

 

11

 Civil Work of Process Area

AFCO

    

  

    

 

12

 Fireproofing Work

Glotec

    

  

    

 

13

 Main Painting Work

Hanny

    

  

    

 

14

 Civil Work of Cooling Tower Area

AFCO

    

  

    

 

15

 Tank Dike Work

AFCO

    

  

    

 

16

 Power Generator Foundation Work

Naruny

    

  

    

 

17

 The Civil Work of OBL Area

Glotec

    

  

    

 

18

 Instrument Work

â()

    

  

    

 

19

 Electrical Work

Glotec

    

  

    

 

20

 Insulation Work

Ѻ()

    

  

    

 

21

   #1

PM ӽóʸ

  

  

    

 

22

   #2

PM ӽóʸ

  

  

    

 

23

 Heavy Lift Tower System

PSC Korea

  

  

    

 

 

 

T o t a l

 

 

    

 

 

      86.4%

 

 

ݾ